Contribution of cost-benefit analysis to optimization of eco-design plants

Mellal, L and Djebabra, M (2015) Contribution of cost-benefit analysis to optimization of eco-design plants. Journal of Engineering, Design and Technology, 13(2), pp. 334-346.

Abstract

Purpose – This study aims to interest the eco-design of the systems. This interest is justified by the need to reducing the environmental impacts in phase of the design plant. Design/methodology/approach – It consists of a proposal for a combined methodology of the industrial systems eco-design. This methodology is based on the simultaneous use of a cost-benefit analysis (CBA) method and dependability tools. Findings – In the developed approach, we use the dependability tools for modeling of the functional behavior of the industrial systems and the CBA method for optimization of the industrial system constraints which are in fact environmental constraints. Practical implications – Methodology suggested constitutes an invaluable help to ensure a better integration of the environment in production. Originality/value – Methodology suggested is tallied by the CBA method, which makes it possible to manage the conflict relation between production and environmental protection.

Item Type: Article
Uncontrolled Keywords: reliability; risk assessment
Index terms: integration, methodology, environmental impact, proposal, environmental protection, modelling, risk assessment
Subjects: organizational analysis, environmental engineering, research methods, financial risk, analytical methods, project planning, environmental impact
Topics: Organizational Design, Sustainability, Cost Management, Engineering Principles, Project Management, Research Practice
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here