Examining barriers for the utilization of non-traditional cost estimating models in developing countries: Ghanaian quantity surveyors' perspectives

Agyekum, B; Kissi, E; Yamoah Agyemang, D and Badu, E (2018) Examining barriers for the utilization of non-traditional cost estimating models in developing countries: Ghanaian quantity surveyors' perspectives. Journal of Engineering, Design and Technology, 16(6), pp. 814-827. ISSN 1726-0531

Abstract

Purpose: Cost estimation model serves as a framework for forecasting the probable cost of proposed construction projects. It can be classified either as traditional or non-traditional depending on the cost variables formulation. However, in the building industry, quantity surveyors traditionally estimate the initial cost of building projects using the traditional models, which have been criticized overtime for its inaccuracies. This paper therefore aims to examine barriers for the utilization of non-traditional cost estimating models. Design/methodology/approach: By using a questionnaire survey, respondents were invited to rate their level of agreement on 23 barriers identified from literature and interview (expert’s opinion). Findings: Based on factor analysis inefficient techniques, perceptions of model techniques, unavailability of cost data and lack of understanding and unstable economic conditions were identified as barriers to the utilization of non-traditional cost estimating models. Practical/implications: Findings demonstrate that there is need for quantity surveyors to get adapted to utilization of non-traditional cost models which offers better accuracies than the traditional approaches in their quest to improve their professional practices. Originality/value: This study demonstrates that there are barriers to the utilization of non-traditional cost estimating models in the Ghanaian construction industry, as evident of this will help in policy formulation for the improvement cost estimating practices.

Item Type: Article
Uncontrolled Keywords: barriers; cost model; Ghanaian; non-traditional; utilization
Index terms: forecasting, economic condition, quantity surveying, factor analysis, building industry, estimate, cost data, construction industry, cost estimating, developing country, interview, accuracy, survey, cost model, questionnaire, construction project, methodology, professional practice
Subjects: statistical analysis, industry analysis, development economics, professional development, production management, research methods, accounting and finance, financial and cost management, economic analysis, prediction and forecasting, data collection methods, profession
Topics: International Construction, Business Strategy, Cost Management, Information Management, Research Practice, Project Management, Roles and Professions
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here