Identification of factors affecting productivity in Thailand’s construction industry and proposed maturity model for improvement of the productivity

Pornthepkasemsant, P and Charoenpornpattana, S (2019) Identification of factors affecting productivity in Thailand’s construction industry and proposed maturity model for improvement of the productivity. Journal of Engineering, Design and Technology, 17(5), pp. 849-861. ISSN 1726-0531

Abstract

Purpose: Low productivity is one of the main challenges facing the Thai construction industry. The purpose of this study is to identify factors affecting the productivity of Thailand’s construction industry and to develop a maturity model for improvement of the productivity. Design/methodology/approach: Data were collected quantitatively through questionnaire surveys targeting different Thai construction companies to identify factors affecting the productivity in the Thai construction industry. Based on the identified factors and opinions of experts, a maturity model was then developed and validated. Findings: The top five factors affecting the productivity are labor skills, material management, equipment management, site management and safety. A maturity model for the productivity improvement has been developed, and its performance is satisfactory. Research limitations/implications: The productivity maturity model is based on data collected in Thailand, and the model is valid only in Thailand or other countries which have similar social and economic circumstance. Practical implications: Construction companies may use the proposed maturity model as a framework for improving their productivity. Originality/value: Unlike other studies, which usually rely on an issue-based approach, this study uses a systematic company-wide approach to improve the productivity.

Item Type: Article
Uncontrolled Keywords: construction contractor; labour productivity; maturity model; productivity improvement
Index terms: maturity model, productivity, site management, labour productivity, Thailand, construction industry, equipment management, survey, construction company, methodology, questionnaire, construction contractor
Subjects: operational management, construction operations, data collection methods, organization, practitioner, industry analysis, management, research methods, Geography, evaluation
Topics: Site Management, Plant and Equipment, Roles and Professions, Research Practice, Geographical Context, Business Strategy
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here