Mengistu, D G and Mahesh, G (2020) Dimensions for improvement of construction management practice in Ethiopian construction industry. Journal of Engineering, Design and Technology, 18(1), pp. 21-39. ISSN 1726-0531
Abstract
Purpose: The state of the different practices in construction industry determines its performance level. Hence, improving performance of construction industry needs assessing state of the practices in the industry and devising improvement intervention. The purpose of this paper is to measure improvement requirement level of different construction management practice areas and to identify the underlying improvement dimensions in Ethiopian construction industry. Design/methodology/approach: Questionnaire survey was developed for data collection based on a thorough literature review which yielded 28 construction management practice areas. Purposive sampling method was used to select respondents for the survey. Mean score was used to identify the required improvement level, and one sample T-test was carried out to identify significance of improvement requirement. Factor analysis was conducted to identify the underlying dimensions of the construction management practice areas. Findings: Findings indicate 27 areas need significant improvement. This shows the low level of adoption of good construction management practices in Ethiopian construction industry. Factor analysis resulted in the areas being grouped to four broad improvement dimensions, namely, project management, organization management, knowledge and risk management and project development and contract management. Originality/value: The findings provide information for appropriate action by the stakeholders to raise standards of adopted construction management practices. It also show areas of construction management which require more focused research in the context of Ethiopian construction industry. Considering the similarity of nature of construction industry problems in developing countries, the findings can be extended to similar countries.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction industry; construction management; Ethiopia; project management |
| Index terms: | project management, purposive sampling, construction industry, project development, dimension, risk management, factor analysis, low level, questionnaire, management practice, methodology, survey, Ethiopia, literature review, contract management, developing country |
| Subjects: | project delivery, health monitoring assessment and metrics, data analysis and analytics, data collection methods, risk assessment, statistical analysis, industry analysis, measurement and scaling, development economics, contract management, project management theory and practice, Geography, research methods, management |
| Topics: | Contract Administration, International Construction, Risk Management, Business Strategy, Health and Safety, Project Management, Geographical Context, Research Practice |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here