Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector

Moses, T; Heesom, D and Oloke, D (2020) Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector. Journal of Engineering, Design and Technology, 18(6), pp. 1867-1888. ISSN 1726-0531

Abstract

Purpose: The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information modelling (BIM) from the UK contractors’ perspective. Previous research and efforts have predominantly focussed on the use of technologies for cost estimation and quantity takeoff within a more traditional-led procurement, with a paucity of research focussing on how 5D BIM could facilitate costing within contractor-led procurement. This study fills this current knowledge gap and enhances the understanding of the specific costing challenges faced by contractors in contractor-led projects, leading to the development of 5D framework for use in future projects. Design/methodology/approach: To develop a fully detailed understanding of the challenges and issues being faced in this regard, a phenomenological, qualitative-based study was undertaken through interviews involving 21 participants from UK-wide construction organisations. A thematic data analytical process was applied to the data to derive key issues, and this was then used to inform the development of a 5D-BIM costing framework. Findings: Multi-disciplinary findings reveal a range of issues faced by contractors when implementing 5D BIM. These exist at strategic, operational and technological levels which require addressing successful implementation of 5D BIM on contractor-led projects adhering to Level 2 BIM standards. These findings cut across the range of stakeholders on contractor-led projects. Ultimately, the findings suggest strong commitment and leadership from organisational management are required to facilitate cost savings and generate accurate cost information. Practical implications: This study highlights key issues for any party seeking to effectively deploy 5D BIM on a contractor-led construction project. A considerable cultural shift towards automating and digitising cost functions virtually, stronger collaborative working relationship relative to costing in design development, construction practice, maintenance and operation is required. Originality/value: By analysing findings from primary research data, the work concludes with the development of a 5D BIM costing framework to support contractor-led projects which can be implemented to ensure that 5D BIM is successfully implemented.

Item Type: Article
Uncontrolled Keywords: 5D BIM; building information modelling; contractor-led project; costing framework
Index terms: costing, design development, cost saving, implementation, building information modelling, cost information, construction organization, construction sector, construction project, methodology, commitment, organizational management, interview, cost estimating
Subjects: business, organization, data collection methods, financial and cost management, contractual arrangements, psychology, design process, production management, research methods, accounting and finance, economics, information systems, industry analysis
Topics: Procurement, Business Strategy, Cost Management, Project Management, Research Practice, Organizational Design, Design Practice, Digital Applications
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here