Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective

Ogbu, C P and Adindu, C C (2020) Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective. Journal of Engineering, Design and Technology, 18(2), pp. 326-342. ISSN 1726-0531

Abstract

Purpose: Globally, road projects are notorious for riskiness, which often results in cost overruns. In developing countries, these risks are amplified by economic instabilities and institutional failures. Majority of road projects in these countries are awarded to notedly inept indigenous contractors. Currently, research on the relationship between risks and cost performance of road projects has predominantly focussed on the client’s perspective. Effects of risks on contractors’ cost performance (profit) are inadequately investigated in literature. The purpose of this paper is to determine the relationship between direct risks and cost performance of road projects by indigenous contractors of developing countries from the contractors’ perspective. Design/methodology/approach: The multivariate structural equation modelling technique was used to analyse purposively obtained data from indigenous contractors that recently completed road projects in Nigeria. Findings: It was observed that a significant positive relationship exists between the aggregate project risk, i.e. project risk index of cost (PRIC) and cost performance of the projects. Significant positive relationships were also found to exist between identified cost risk centres and PRIC and between risk factors and cost risk centres. The risk centre site environment and location contributes the most to PRIC. Research limitations/implications: Indigenous contractors of developing countries are to analyse the identified risk factors and centres prior to bidding for road projects and carefully manage them during project execution. Originality/value: Future studies of risks in road project should aim to obtain project risk indices of costs for the projects.

Item Type: Article
Uncontrolled Keywords: cost overrun; cost performance; risk management; road projects
Index terms: road project, future study, risk management, risk factor, Nigeria, aggregate, cost overrun, bidding, cost performance, methodology, profit, structural equation modelling, developing country
Subjects: financial and cost management, economic analysis, bidding, materials science, research design and methodology, risk assessment, environmental hazards, statistical analysis, development economics, infrastructure engineering, Geography, research methods, economics
Topics: Risk Management, Sustainability, Procurement, Business Strategy, Cost Management, Engineering Principles, Research Practice, Geographical Context, International Construction
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here