A comparative analysis of administrative delays in hospital buildings

Greenwood, D J; Osborne, A N and Aggiag, M A (2001) A comparative analysis of administrative delays in hospital buildings. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Abstract

Hospitals tend to be large, complex projects, with a variety of technological needs that usually change over time. For this and other reasons, hospitals present considerable challenges for those planning their procurement. It is a measure of the extent of the challenge that hospital projects are particularly susceptible to delays, some of which appear to be common to the construction of large hospitals wherever they are built. In a number of surveys of construction professionals, one of the most influential causes of delay on large public projects has been found to be administrative reasons, and we undertook to research this factor in more depth in the context of hospital building. In order to do this, two completed hospital projects were chosen as case studies: the Tripoli Medical Centre in Libya and Guy's Hospital, London. The choice was based on the particular interests of the researchers and the availability of information. The aim of the research is to use these studies as a basis for exploring the impact of administrative delays on the construction of hospitals.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: project delays; hospital construction; case study; cost overrun; design
Index terms: construction professional, public project, London, healthcare building construction, causes of delay, complex project, project delay, Libya, case study, cost overrun, comparative analysis, survey
Subjects: Geography, infrastructure engineering, professional development, project controls, building construction, data collection methods, data analysis and analytics, strategic project management, financial and cost management
Topics: Design Practice, Time Control, Cost Management, Engineering Principles, Information Management, Project Management, Geographical Context, Research Practice
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here