The implementation of constructability: A prerequisite in raising the quality of project outcome

Hiley, A and Yagci, O (2001) The implementation of constructability: A prerequisite in raising the quality of project outcome. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Abstract

The success of a project is of importance not only to all parties working within a country's construction industry but also to those for whom the built environment is provided. A factor which can significantly affect project outcome is the relationship between design and construction. The weakness of the link between these activities can affect constructability resulting in problems such as delays and increased costs. An awareness of the interdependency between design and construction is an important prerequisite to promoting their closer integration and thereby obtaining the benefits of constructability. A critical review of the literature on design and constructability is related to a study of the Turkish construction industry. The Turkish construction industry reflects the profile of the UK construction industry, as it has a strong sector of large companies working in the international market and a sector comprised of small locally-based companies. The research evidence supports the conclusion that within the Turkish construction industry the constructability issues are being addressed by large scale companies, but not by small companies. Improvements in education and the strengthening of the national economy are required to raise the standard of project outcome within small companies and improve the implementation of constructability.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: constructability; design; project development
Index terms: construction industry, implementation, constructability, project development, design and construction, international market, built environment, national economy, evidence, strengthening, integration, project outcome
Subjects: contractual arrangements, economic analysis, project delivery, evaluation and assessment methods, project completion, organizational analysis, infrastructure and transport systems, industry analysis, structural engineering, construction integration, development economics
Topics: Business Strategy, Engineering Principles, Project Management, Research Practice, Procurement, Urban Studies, Design Practice, International Construction, Organizational Design
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here