Identifying the performance areas affecting the project performance for Indian construction projects

Prachi Vinod, I; Gangadhar, M and Deepak, M D (2021) Identifying the performance areas affecting the project performance for Indian construction projects. Journal of Engineering, Design and Technology, 19(1), pp. 1-20. ISSN 1726-0531

Abstract

The construction industry is facing challenges because of performance shortfalls. Construction projects are highly complex, distinctive, fragmented and do not have well-established performance assessment models to evaluate their project success. The purpose of this paper is to assess the direction through determination of performance areas that would affect project performance in Indian construction projects. A survey instrument was developed to gather data on the perception of industry professionals on these identified areas. Purposive sampling method was used to select respondents for the survey. These performance areas are ranked using relative importance index to ascertain a level of importance among the group. Factor analysis (FA) was conducted to identify the significant performance areas project performance. Further to identify the most influence performance areas on Indian construction projects, multiple regression analysis was carried out. Findings indicated 28 significant performance areas. This shows the low level of adoption of good construction management practices in Indian construction projects. FA resulted in the areas being grouped to nine broad significant performance areas with 59.49% of the total variance, namely, quality, schedule, environment and stakeholder satisfactions, cost, productivity, safety, communication management, customer relations and finance. Multiple regression analysis revealed two pivotal factors “customer relations" and “schedule" that significantly influence project performance in Indian construction industry. The outcome of the study will guide project stakeholders, who desire to improve project performance on construction projects, to prioritize their efforts. It also highlights performance areas of project management which required more focussed research in the context of Indian construction projects. The findings can be extended to the developing countries.

Item Type: Article
Uncontrolled Keywords: communication; construction project; customer relations; developing countries; performance; productivity; project success; safety; professional; project stakeholder; stakeholders; factor analysis; multiple regression; project performance; regression analysis; India
Index terms: low level, customer relation, developing country, project management, factor analysis, multiple-regression, management practice, purposive sampling, construction industry, relative importance index, project success, survey, project stakeholder, productivity, performance areas, India, construction project, stakeholder satisfaction, regression analysis, multiple regression analysis, variance, project performance, performance assessment
Subjects: Geography, risk assessment, statistical analysis, measurement and scaling, sociology, data collection methods, management, production management, research methods, project management theory and practice, participation process, operations management, industry analysis, assessment methods, development economics
Topics: Business Strategy, Human Resources, Stakeholder Management, International Construction, Geographical Context, Risk Management, Project Management, Research Practice
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here