Mengistu, D G; Ashene, D A and Halabo, H A (2024) Technology and innovation development in Ethiopian construction industry: the challenges and improvement mechanisms. Journal of Engineering, Design and Technology, 22(6), pp. 1936-1957. ISSN 1726-0531
Abstract
Purpose: The purpose of this study is to investigate the challenges and potential improvement mechanisms for the development of technology and innovation in the Ethiopian construction industry. Design/methodology/approach: In this study both quantitative and qualitative research approaches were adopted. While a structured questionnaire was used for the quantitative data collection, semi-structured interview was used for qualitative data collection. In analyzing the quantitative data, mean score was used to rank the variables and factor analysis was conducted to identify the underlying dimensions of the research constructs. The qualitative data was analyzed thematically focusing on specific objectives of the study; the challenges and improvement mechanisms of technology and innovation development. Findings: The findings indicate that the major challenges are nature of the industry and lack of awareness, weak capacity of companies and the regulatory instruments, inadequate tender duration and poor monitoring and controlling practice. The suggested improvement mechanisms are effective coordination of the process and awareness creation, promoting technology and innovation in the procurement process and technology and innovation consideration in construction project registration. Originality/value: Effectiveness of construction industry improvement programmes is affected by inappropriateness of the adopted implementation mechanisms. Understanding the operating environment; the enablers and potential barriers, is important for the success of any envisioned improvement programme. The improvement framework proposed by this study indicates the potential intervention areas and improvement mechanisms to effectively induce and enhance technology and innovation development in the construction industry. Major pillars of the improvement framework are improving regulatory framework, raising awareness and stakeholder engagement and continual monitoring and controlling of the practice. © 2023, Emerald Publishing Limited.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | challenges; construction industry; Ethiopia; regulatory framework; technology and innovation development |
| Index terms: | innovation development, interview, procurement process, programme, Ethiopia, qualitative research, methodology, construction project, questionnaire, monitoring, effectiveness, stakeholder engagement, factor analysis, implementation, construction industry, duration, dimension, coordination |
| Subjects: | Geography, production management, management, performance management, research methods, industry analysis, statistical analysis, project controls, control systems, community and social dimensions, innovation studies, data collection methods, research design and methodology, contractual arrangements, health monitoring assessment and metrics |
| Topics: | Research Practice, Project Management, Geographical Context, Business Strategy, Health and Safety, Procurement, Stakeholder Management, Quality Management, Time Control, Site Management, Organizational Design |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here