Diekmann, J E and Peppier, S E (1984) Union and open shop labor cost differences. Journal of Construction Engineering and Management, 110(1), pp. 87-99. ISSN 0733-9364
Abstract
One area within the construction industry that has dramatically changed is the growth of open shop construction. This growth suggests that open shop general contractors may have a competitive advantage over union general contractors. This paper investigates productivity and wage rate variances between Colorado open shop and union general contractors on projects completed since January 1981. Though there is little productivity variance, a significant variance of wage rates indicate the Colorado open shop general contractor presently has a clear overall labor advantage. The productivity and wage rate variance of 29 individual project job tasks were investigated. Data was collected from 35 union and 20 open shop contractors' project labor costs reports. Additional information was collected during interviews with representatives of eleven general contractors. The productivity and wage rate variances are described by individual job tasks; by the union craft jurisdictions of laborers, carpenters, ironworkers, and cement finishers; and by an overall comparison between open shop and union general contractors.
| Item Type: | Article |
|---|---|
| Index terms: | interview, jurisdiction, general contractor, labour cost, construction industry, variance, competitive advantage, carpenter, productivity |
| Subjects: | legal systems, practitioner, data collection methods, industry analysis, cost management, market analysis, measurement and scaling, management |
| Topics: | Legal Issues, Procurement, Roles and Professions, Research Practice, Business Strategy |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here