Computerized specifications on a small project

Wilkinson, R W (1984) Computerized specifications on a small project. Journal of Construction Engineering and Management, 110(3), pp. 337-345. ISSN 0733-9364

Abstract

Since 1973, the U.S. Bureau of Reclamation has been conducting a Rehabilitation Program for the Midvale Irrigation District near Riverton, Wyoming. The work consists primarily of upgrading the distribution system of open ditches and constructing new buried pipe drains in the farmer’s fields. Work is done under eight to ten small contracts each off-irrigation season (October to April). Since the type of work does not vary from year to year, specifications writing is basically an updating and retyping of the previous year’s specifications. A system was developed using the Bureau’s dual CYBER 170/800’s (CDC) computer and Xerox 9700 Electronic Printing System in Denver; a LA36 DECwriter timesharing terminal in Riverton; and a versatile formatting system known as COMPOSE/RUNOFF. Specifications are now prepared at a considerable savings of time, manpower, and money.

Item Type: Article
Index terms: reclamation, small project, upgrading, savings, program, specification
Subjects: contractual condition, production management, strategic management, economic analysis, land management, software systems
Topics: Contract Administration, Project Management, Sustainability, Digital Applications, Business Strategy
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here