Stochastic priority model for aggregate blending

Easa, S M and Can, E K (1985) Stochastic priority model for aggregate blending. Journal of Construction Engineering and Management, 111(4), pp. 358-373. ISSN 0733-9364

Abstract

Aggregate blending models that incorporate the optimization of two objectives with their priority levels are presented. The two objectives include the minimization of the mean deviation (or mean absolute deviation) from the midpoint of specification limits and the minimization of the unit cost of the blend. The models are applicable to any number of aggregates and can be used to provide the optimum proportions corresponding to a given priority level or to establish trade-off curves between mean deviation and cost. The stochastic elements of aggregate gradations are formulated and incorporated into the models. Both the deterministic and stochastic models are applied to a numerical aggregate blending problem, and extensions of the models to accommodate some practical cases are presented.

Item Type: Article
Index terms: aggregate, deviation, unit cost, minimization, specification
Subjects: materials science, contractual condition, financial and cost management, algorithms
Topics: Engineering Principles, Digital Applications, Contract Administration, Cost Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here