Reaney, M; Griffith, A; Watson, P A and Ellis, C (2001) Construction cost control implications for the planning application process. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Abstract
In recent years a series of Governmental reports, including, Latham (1994), Constructing the Team, Egan (1998), Rethinking Construction and Rogers (2000), The Urban Task Force Report, have focussed on various aspects of optimizing working relationships and controlling costs within the construction sector. Hitherto, the focus had primarily been in the fields of improved communications, value engineering, buildability and waste reduction. In parallel there has been a series of White Papers and revised Planning Policy Guides produced by Government broadly aimed at fostering the concept of 'sustainability'. It is postulated that these strands come together in the planning application process and that public policy frequently finds expression as planning agreements. These translate as costs to the construction sector. Whereas, for example, it can be shown that control of waste is subject to a 'law of diminishing returns' relationship, the costs of planning agreements are both difficult to predict at the outset of a project and are not necessarily proportional to the value of the project. Results of an empirical pilot study, conducted as part of an ongoing research project, have revealed that the majority of the sample of developers surveyed had no strategy for approaching planning agreement negotiations. It is contended that a more significant, but highly variable, return on investment is potentially attainable by developers from the effective management of planning negotiations than may be achievable through waste reduction measures.
| Item Type: | Conference Paper (Paper) |
|---|---|
| Uncontrolled Keywords: | cost control; cost savings; property developers; local authority; planning process |
| Index terms: | planning process, Latham, buildability, strategy, local authority, value engineering, construction cost, cost control, return on investment, cost saving, construction sector, planning policy, waste reduction, public policy, agreements, negotiation |
| Subjects: | economics, management, sustainability assessment, sociology, project controls, industry policy reports, conflict resolution, industry analysis, design efficiency, value management, public policy, contract formation, economic analysis, financial and cost management |
| Topics: | Contract Administration, Time Control, Design Practice, Stakeholder Management, Sustainability, Governance, Cost Management, Business Strategy, Research Practice |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here