Atkin, B L and Gill, E M (1986) Cad and management of construction projects. Journal of Construction Engineering and Management, 112(4), pp. 557-565. ISSN 0733-9364

Abstract

The increasing interest in computer-aided design (CAD) has prompted research that is aimed at identifying the opportunities for construction managers and building contractors. It has been found that the use of CAD systems in the U.K. is mainly confined to the production of detailed drawings. Indeed, most of the systems used are 2-D drafting tools and incapable of supporting the integration of even modest amounts of nongraphical (construction) data. On the other hand, many 3-D modeling systems have the potential to integrate construction data, although they appear to be almost ignored. The use of 3-D modeling systems is considered to be the most suitable vehicle for successfully integrating these data. However, this is likely to necessitate the introduction of separate databases, preferably of the relational type. The use of 3-D modeling systems in assessing the construction implications of outline designs also presents interesting possibilities and is discussed.

Item Type: Article
Index terms: building contractor, database, drafting, modelling, drawing, construction project, integration, computer aided design, construction manager
Subjects: organizational analysis, data management, production management, analytical methods, technical documentation, practitioner, computational design, profession
Topics: Roles and Professions, Project Management, Engineering Principles, Organizational Design, Design Practice, Digital Applications
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here