Construction production planning

Handa, V K and Barcia, R M (1986) Construction production planning. Journal of Construction Engineering and Management, 112(2), pp. 163-177. ISSN 0733-9364

Abstract

A new branch of optimization, Optimal Control Theory, is used as a computational method to formulate and solve construction production planning problems. An example of the literature, Griffis' application of queueing theory to determine the optimal number of trucks to perform an earthmoving job, is used. It is shown that under the presence of weather varying conditions, optimal production rates may be time varying. A feedback solution is found. The implications of such solution are discussed. A simulation is performed to compare the use of varying and constant production rates.

Item Type: Article
Index terms: construction production, presence, earthmoving, weather
Subjects: environmental science, construction operations, operations management, air quality
Topics: Site Management, Sustainability
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here