Method for analyzing construction haul noise impacts

Harris, R A; Bowlby, W and Cohn, L F (1987) Method for analyzing construction haul noise impacts. Journal of Construction Engineering and Management, 113(1), pp. 6-16. ISSN 0733-9364

Abstract

Long-term construction projects have the potential to adversely affect the quality of life of residents living adjacent to the proposed activity. It is therefore desirable to quantify the relative impacts of various options as a part of the overall decision-making process in choosing a preferred alternative. A technique is described that compares the potential noise impacts of construction hauling for a number of project alternatives. The technique presented herein is based on a modification of the level weighted population method to account for the duration of the hauling activity along various haul routes. The resulting descriptor is termed the level/duration weighted population (LDWP). The use of this technique is demonstrated through application to an actual flood control construction project under study by the U.S. Army Corps of Engineers. The LDWP method allowed the Corps to quantitatively evaluate various project alternatives from the haul noise impact point of view.

Item Type: Article
Index terms: population, decision-making process, option, quality of life, engineer, duration, construction project
Subjects: production management, profession, project controls, demography, decision analysis, public and environmental health
Topics: Project Management, Time Control, Risk Management, Urban Studies, Health and Safety, Roles and Professions
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here