Hierarchical rule-based activity duration estimation

Hendrickson, C; Martinelli, D and Rehak, D (1987) Hierarchical rule-based activity duration estimation. Journal of Construction Engineering and Management, 113(2), pp. 288-301. ISSN 0733-9364

Abstract

Activity durations are often estimated by modifying standard work productivities for specific site and job characteristics. Modifications are typically developed from engineering judgment and past experience. In this paper, an explicit hierarchical rule-based framework for making such modifications is investigated. By explicitly formulating estimation rules, the factors felt to influence work productivity can be identified and the accuracy of particular modification rules assessed. Alternative estimation methods such as statistical techniques and a hybrid rule-and-statistical framework are discussed. A prototype expert system for masonry construction duration estimation, MASON, is described and used to illustrate the rule-based estimation approach. Facilities in MASON for explanation and productivity improvement analysis are also described.

Item Type: Article
Index terms: productivity, estimation, expert system, accuracy, duration, mason, prototype, judgment
Subjects: professional development, management, data management, financial and cost management, dispute resolution, modelling and simulation, practitioner, project controls
Topics: Time Control, Legal Issues, Cost Management, Business Strategy, Information Management, Roles and Professions, Engineering Principles, Digital Applications
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here