Designing plans for constructibility

King, R (1987) Designing plans for constructibility. Journal of Construction Engineering and Management, 113(1), pp. 1-5. ISSN 0733-9364

Abstract

This paper discusses problems with contract documents prepared for roadway rehabilitation that field engineers experience during construction. It addresses the issues of existing utilities, drainage, and right-of-way restrictions as they impact proposed construction. It identifies specific problem areas experienced during construction and describes modifications that were made in the field in order to solve the problems. The major theme of the paper is that not enough time and/or consideration seems to be given to alleviate conflicts with existing conditions during design. This means that significant design modifications must be made in the field in order for many of the items to be constructed. The paper raises the issue that a better product will result if conflicts are eliminated during design.

Item Type: Article
Index terms: design modification, engineer, utilities, contract document, drainage
Subjects: infrastructure and transport systems, design changes, contractual condition, profession, construction type
Topics: Design Practice, Contract Administration, Engineering Principles, Roles and Professions, Construction Technology
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here