Construction management responsibilities during design

Stukhart, G (1987) Construction management responsibilities during design. Journal of Construction Engineering and Management, 113(1), pp. 90-98. ISSN 0733-9364

Abstract

For the last 10 years it has been increasingly recognized that the level of influence over costs is greatest during the design phase of a project, and that construction knowledge is necessary in this phase. The construction manager can provide this knowledge in many design and design-related functions, listed in this paper. The construction manager is an advisor only on actual design, but takes a leadership role in many of the planning and control functions, such as contract packaging, schedules, site layouts, access,, work rules, and labor and safety provisions. With the leadership role there is a potential liability in design review, cost and schedule estimates, and on-site design-related functions. All parties, especially owners, should recognize the use of construction expertise, but also the liability risks that accompany such responsibilities.

Item Type: Article
Index terms: owner, estimate, design phase, site layout, liability, leadership role, construction manager
Subjects: leadership, liability law, sociology, professional practice, site logistics, financial and cost management, profession
Topics: Stakeholder Management, Roles and Professions, Cost Management, Site Management, Human Resources, Design Practice, Legal Issues
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here