Slipforming IBM tower

Kangari, R; Pruitt, J D and Cheema, T S (1988) Slipforming IBM tower. Journal of Construction Engineering and Management, 114(3), pp. 472-488. ISSN 0733-9364

Abstract

The IBM Tower in Atlanta, Georgia, is an extraordinary construction project with fascinating architectural, engineering, and construction innovation and practice. The building was constructed using a concrete slipform core with structured steel floor framing, composite exterior columns, and granite skin with insulated gray tinted glass. A team approach has resulted in a maximum amount of quality construction being accomplished in minimum time, and the project being completed within a tightly controlled schedule. A three-phase value engineering study was conducted for this project. In Phase I, eleven floor framing systems and eight wind framing systems (which in combinations gave forty-two possible schemes for the structure) were developed. In Phase II, pricing information of structural steel was developed. In Phase III, a typical floor and columns, and wind-resisting elements for the entire height were designed. Using this information, the unit cost of structure and the total construction time were estimated. This paper provides an overview of the IBM Tower, value engineering results, and slipformed core construction used in this project.

Item Type: Article
Index terms: unit cost, pricing, column, framing, value engineering, construction time, composite, Georgia, construction innovation, construction project
Subjects: materials science, conceptual models, value management, financial and cost management, economic analysis, Geography, project controls, building construction, production management, structural engineering
Topics: Cost Management, Engineering Principles, Project Management, Research Practice, Geographical Context, Time Control, Business Strategy, Construction Materials
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here