Educating construction managers

Riggs, L S (1988) Educating construction managers. Journal of Construction Engineering and Management, 114(2), pp. 279-285. ISSN 0733-9364

Abstract

The speed with which the Construction Management (CM) system has entered the daily practices of the construction industry has caught educators in a lag. The management of construction and construction management were considered synonymous until construction management became a formal contracting system. Educators designed construction education programs around the needs of the general contractor and the requirements of the general contracting system. As CM became popular, educators began teaching the CM process but have not yet totally modified instructional programs to accommodate the unique requirements of construction managers. This paper establishes the differences between the educational requirements of a contracting-oriented program and a construction management-oriented program with respect to the management tools and the philosophy of those using the tools.

Item Type: Article
Index terms: construction industry, philosophy, general contractor, construction manager, program, construction education
Subjects: industry analysis, philosophical studies, professional education, software systems, practitioner, profession
Topics: Roles and Professions, Research Practice, Education, Digital Applications
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here