Factors affecting construction planning efforts

Cohenca, D; Laufer, A and Ledbetter, W B (1989) Factors affecting construction planning efforts. Journal of Construction Engineering and Management, 115(1), pp. 70-89. ISSN 0733-9364

Abstract

It is widely accepted that environmental uncertainty strongly affects decision makers' performance and that the construction environment is very uncertain. Despite awareness of the consequences of uncertainty on a project, little attention has been paid to its effects on construction management, particularly on the planning function. The paper focuses on the assessment of the effect of environmental variables on the efforts invested in planning. The effect of eight situational variables is evaluated by measuring the time invested in planning and control, as well as the frequency of revisions. The variables examined are: number of subcontractors, number of trades, objectives rigidity, percentage-completion of design, past construction experience, predictability of weather, availability of labor, and attitudes towards planning. The study concludes that efforts should be adjusted to meet variable situations.

Item Type: Article
Index terms: weather, subcontractor, construction planning, environmental uncertainty
Subjects: air quality, financial risk, practitioner, construction planning
Topics: Roles and Professions, Sustainability, Cost Management, Site Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here