Remote oil and gas facility construction

Wyrick, D A and Eschenbach, T G (1989) Remote oil and gas facility construction. Journal of Construction Engineering and Management, 115(2), pp. 228-236. ISSN 0733-9364

Abstract

The construction of oil and gas facilities on integrated barge units (IBUs) is presented. This technique of construction could be useful in remote wilderness locations. The function of the facilities, alternate construction techniques, and the effects of location and terrain conditions are discussed. Construction costs using the IBU method are estimated to represent a 16% savings in capital costs over modular construction, and facility startup can be advanced by up to five months. Using an IBU instead of a stickbuilt facility may represent a 44% savings in cost. In addition, maintenance, abandonment, and site rehabilitation are discussed and compared. For every aspect of cost presented, the integrated barge unit offers a less costly alternative. Depending on the specific location, this technique could also represent less of an impact to the surrounding environment than the more traditional techniques of oil and gas facility construction.

Item Type: Article
Index terms: oil and gas, startup, savings, construction cost, modular construction, abandonment, capital cost
Subjects: business, economic analysis, financial and cost management, accounting and finance, industry analysis, completion, building construction
Topics: Business Strategy, Cost Management, Research Practice, Project Management, Construction Technology
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here