Lift of Shippingport reactor pressure vessel

Duerr, D (1990) Lift of Shippingport reactor pressure vessel. Journal of Construction Engineering and Management, 116(1), pp. 188-197. ISSN 0733-9364

Abstract

The Shippingport Atomic Power Station in western Pennsylvania is the first nuclear electric generating station to be decommissioned with the goal of restoring the site to a radiologically clean condition that is acceptable for unrestricted use. In December, 1988, the 956-ton (870-T) reactor pressure vessel/neutron shield tank assembly was lifted out of the containment building and loaded onto land transportation equipment in preparation for removal from the site and shipment to a burial facility in Washington State. This paper reviews the engineering requirements for the lift and removal from containment of the reactor pressure vessel package. Design criteria for the lifting and handling equipment, prelift testing and inspection requirements, and operational methodology employed during the lift are examined. Recommendations are made for future work of this nature performed as a part of nuclear plant maintenance and decommissioning projects, with particular emphasis on design requirements for lifting and handling equipment.

Item Type: Article
Index terms: lifting, power station, methodology, inspection, package, decommissioning, land, testing
Subjects: real estate economics, contractual arrangements, professional practice, renovation and retrofit, research methods, occupational health and safety management, infrastructure and transport systems, quality assurance
Topics: Urban Studies, Quality Management, Health and Safety, Research Practice, Engineering Principles, Procurement
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here