Cost model for reinforced concrete beam and slab structures in buildings

Singh, S (1990) Cost model for reinforced concrete beam and slab structures in buildings. Journal of Construction Engineering and Management, 116(1), pp. 54-67. ISSN 0733-9364

Abstract

An interactive, computer-based cost model has been developed for approximate cost estimation of reinforced concrete beam and slab construction in high-rise commercial buildings, A number of design variables, such as different structural schemes, grid sizes, number of stories, grades of concrete, grid locations, and section of beams, have been incorporated in the model to assess their effect on cost and quantities of constituents of concrete construction. The use of the model is recommended for comparative cost estimation to determine the effect of design parameters on structural cost; for approximate structural-cost estimation of an overall project; for checking of estimates for structural works; for calculation of quantity index for structural schemes and system; for budgeting of materials, and, finally, for use in various studies in building economics.

Item Type: Article
Index terms: commercial building, concrete construction, building economics, cost model, cost estimating, budgeting, beam, estimate, design parameter, slab construction, reinforced concrete beam
Subjects: construction type, building materials, financial and cost management, financial management, structural engineering, building construction, design constraints, cost management
Topics: Design Practice, Site Management, Business Strategy, Cost Management, Construction Materials, Engineering Principles, Construction Technology
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here