Abudayyeh, O Y and Rasdorf, W J (1991) Design of construction industry information management systems. Journal of Construction Engineering and Management, 117(4), pp. 698-715. ISSN 0733-9364
Abstract
Effective management of construction projects depends on good access to and control of data, especially data pertaining to cost and schedule control functions. Long recognizing the need to integrate these interrelated functions, researchers have proposed conceptual models to achieve this purpose. However, the proper design of an automated solution that would support the needs of integrated cost and schedule control and provide distributed access to data for different processing needs has been lacking. The purpose of this paper is to show how such an automated solution (represented by a data storage model) was properly designed and developed. The data storage model is developed using the first three steps of the process used to model engineering problems. The first step, problem definition, was accomplished using the work packaging model to solve the integration problem and by using data collection forms developed by R. S. Means Company to identify what data items are collected in cost and schedule control. The second step, conceptual modeling, utilizes Nijssen’s information analysis methodology (NIAM) for data modeling. For the third step, computational modeling, the relational data model is selected. Each of the foregoing steps is described in detail in this paper.
| Item Type: | Article |
|---|---|
| Index terms: | conceptual modelling, modelling, construction industry, data modelling, data storage, management system, data model, integration, methodology, construction project, schedule control |
| Subjects: | industry analysis, data management, project controls, organizational analysis, production management, research methods, theoretical framing, management, analytical methods, data science |
| Topics: | Project Management, Research Practice, Engineering Principles, Organizational Design, Time Control, Digital Applications |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here