Management of engineering/design phase

Eldin, N N (1991) Management of engineering/design phase. Journal of Construction Engineering and Management, 117(1), pp. 163-175. ISSN 0733-9364

Abstract

This paper critiques the common practice in managing and tracking the engineering/design phase of major projects and presents an alternative integrated approach. It addresses in detail the development of control budget, project schedule, progress measurement procedure, and project data base to accomplish full cost and scheduling integration. Cost/schedule integration is achieved by: (1) Developing control budget based on the project work breakdown structure (WBS); (2) identifying all project documents on the project WBS; (3) grouping the project documents in work packages; (4) making reference to the work packages on the project schedule; (5) determining distinguishable events (control points) for each package; and (6) using the earned value concept as the means for progress measurement. The procedure is capable of objectively determining the progress of the scheduling activities, performance indices, and budget forecasts. A numerical example and a case study are provided to illustrate the implementation and computational procedure of the presented approach.

Item Type: Article
Index terms: integrated approach, project data, major project, package, scheduling, case study, implementation, documents, design phase, progress measurement, integration, budget forecast, critique
Subjects: organizational analysis, financial and cost management, contractual arrangements, strategic project management, operations research, evaluation and assessment methods, professional development, professional practice, project controls, data collection methods
Topics: Procurement, Information Management, Design Practice, Time Control, Research Practice, Project Management, Cost Management, Organizational Design
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here