Cost-and schedule-control integration: Issues and needs

Rasdorf, W J and Abudayyeh, O Y (1991) Cost-and schedule-control integration: Issues and needs. Journal of Construction Engineering and Management, 117(3), pp. 486-502. ISSN 0733-9364

Abstract

Cost control and schedule control are two of the most important management functions in the construction industry. Major research efforts are focused on developing procedures for improving the effectiveness of cost and schedule control. As a result, researchers are concerned with the quality, integrity, and timeliness of data that flow through such control systems. A number of data models have been proposed to integrate cost-and schedule-control functions, because such integration is viewed as the, solution to the many problems facing construction projects today. This paper provides an overview of cost-and schedule-control functions, defines the desired control cycle, and discusses the problems and needs of cost-and schedule-control functions. A number of integrated cost- and schedule-control data models, which represent the state of construction research in this area, are discussed. The work-packaging model is briefly described and is suggested as the most likely existing model to achieve the desired cost and schedule integration. Finally, the conceptual design of a foundational data model for control, based on relational concepts, is provided. The recommended design adopts the conceptual structures of the work-packaging model.

Item Type: Article
Index terms: schedule control, control system, cost control, construction project, integration, data model, conceptual design, effectiveness, construction industry, integrity
Subjects: industry analysis, organizational analysis, project controls, monitoring and control, production management, health safety and environment, performance management, design practice, financial and cost management, data science
Topics: Research Practice, Project Management, Health and Safety, Cost Management, Business Strategy, Quality Management, Digital Applications, Design Practice, Time Control, Organizational Design
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here