Labor productivity and work sampling: The bottom line

Thomas, H R (1991) Labor productivity and work sampling: The bottom line. Journal of Construction Engineering and Management, 117(3), pp. 423-444. ISSN 0733-9364

Abstract

This paper describes the relationship between labor productivity and direct work as reported in work-sampling studies. Seven data bases, collected primarily from nuclear-power-plant construction projects, are used. Investigations of a 30-project data base show that direct work is better in the winter than during the rest of the year, is best during the start-up and testing phase, and has improved since the Three Mile Island accident. It is concluded that these results are illogical. Using linear regression models, the paper shows that direct work is not related to productivity. This conclusion is based on three assumptions: Reducing wait time leads to increased direct-work time, increased direct-work time leads to better productivity, and better productivity is accompanied by less time spent waiting. Each assumption is tested, and the model statistics show very poor correlations and predictive capabilities. The most reliable data base, consisting of 46 data points, yielded an [equation found] value of 0.00 and a standard error of the estimate that is equal to the standard deviation of the performance measure. The conclusion is that work-sampling studies show how busy the crafts are, and the results cannot be used to predict labor productivity or to quantify inefficient work hours.

Item Type: Article
Index terms: statistics, testing, estimate, investigation, sampling, labour productivity, deviation, productivity, regression model, construction project, project data, performance measure, winter
Subjects: production management, performance measurement, management, statistical analysis, climate science, mathematical modelling, data collection methods, financial and cost management, professional practice
Topics: Project Management, Research Practice, Engineering Principles, Cost Management, Business Strategy, Sustainability, Quality Management, Site Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here