Multitask motion planning for material handling in construction

Beliveau, Y J; Dixit, S S; Dal, T and Morad, A A (1993) Multitask motion planning for material handling in construction. Journal of Construction Engineering and Management, 119(1), pp. 180-191. ISSN 0733-9364

Abstract

This paper describes a proposed system, Multi-Task Motion Planning (MTMP) for planning and modeling operations of large material-handling equipment typically found in construction. The system will provide the capability to effectively plan conflicting multiple tasks to be performed concurrently and also provide a mechanism to directly output code to automate the overall process. MTMP aims at integrating structural dynamic behavior of the equipment at the path-planning stage to resolve conflicts. A geometric/graphical approach is proposed that considers equipment constraints and degrees of freedom. The system is conceived within a three-dimensional computer-aided design (CAD) animation and simulation graphics package, which allows modeling of the environment and provides an interactive tool for motion planning. A capability to store motion variables for individual objects will allow for automatically generating code for automation. The system has been envisioned to meet the demand for automation to improve planning and operational safety in the construction industry. However, the underlying concepts can be useful for a variety of material-handling operations and off-line programming of robots.

Item Type: Article
Index terms: automation, modelling, construction industry, package, programming, computer aided design, material handling
Subjects: automation and robotics, industry analysis, computational design, programming, analytical methods, contractual arrangements, product delivery
Topics: Engineering Principles, Research Practice, Procurement, Supply Chain Management, Digital Applications
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here