Placement-oriented design and delivery of concrete reinforcement

Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364

Abstract

The use of reinforced concrete in the United States is steadily increasing, and with it the need for designed and fabricated reinforcing bars (rebar). Traditionally, the detailing of the rebar is done by the fabricator, who is required to have the shop drawings approved by the civil engineer in charge of the structural design. Subsequently, the rebar is fabricated and shipped to the site where an independent subcontractor places the rebar according to the detail design. Research has shown that the dehvcry of construction material is strongly related to the productivity of construction processes, such as laying rebar. However, traditional rebar fabrication and shipment is geared towards minimizing the set-up time of the rebar bending machine. As a result, rebar is cut, bent, and bundled according to shape and size without considering the sequence of placing the bars. This paper presents an alternative way to design and deliver concrete reinforcement that is based on computer integration and feature-based design concept. Detailing data generated with CAD software is used to create rebar placement plans, shipping schedules, and assignments of lay-down area on the construction site. Based on experiences with the application of the system, steps necessary for its implementation are discussed.

Item Type: Article
Index terms: reinforcement, construction material, civil engineer, implementation, United States, construction site, reinforced concrete, structural design, subcontractor, integration, placing, construction process, placement, drawing, productivity, rebar, fabrication
Subjects: concrete and cementitious materials, architectural engineering, management, building construction, profession, technical documentation, Geography, practitioner, contractual arrangements, organizational analysis, work location, building materials, manufacturing engineering
Topics: Design Practice, Construction Materials, Business Strategy, Procurement, Roles and Professions, Engineering Principles, Site Management, Organizational Design, Human Resources, Geographical Context
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here