Integrated system for managing owner-directed project acceleration

Riad, N I; Arditi, D and Mohammadi, J (1994) Integrated system for managing owner-directed project acceleration. Journal of Construction Engineering and Management, 120(1), pp. 77-95. ISSN 0733-9364

Abstract

An integrated computerized system is described that can be used as a dispute-resolution tool for managing owner-directed acceleration. It can also be used as an aid for helping owners and contractors foresee the implications of accelerating a project in terms of cost and liabilities involved. The system is composed of an analysis module written in LISP as its backbone, and a knowledge base limited to related aspects in major contract forms. After obtaining the initial information from the user, the system triggers the analysis module. The analysis module generates several schedules to perform time-impact analysis. Then, the system uses the knowledge base to assign liabilities to the parties for past events, including delayed, accelerated, added, and canceled (DAAC) activities that were not foreseen in the original schedule. It does this by means of a set of if-then rules and certainty indices based on the responses obtained from the user. The system then incorporates this information chronologically into a compression analysis carried out again by the analysis module. The system can make a human mediator’s job more effective and economical, and can also considerably reduce the occurrence of acceleration-related disputes.

Item Type: Article
Index terms: integrated system, resolution, acceleration, module, owner, dispute, mediator, impact analysis, computerized system, knowledge base, compression, liability
Subjects: material properties and characteristics, architectural elements, information systems, liability law, conflict resolution, project controls, sociology, dispute resolution, computing systems, design methods, data analysis and analytics
Topics: Stakeholder Management, Research Practice, Construction Materials, Time Control, Legal Issues, Design Practice, Digital Applications
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here