Developing acceptance-sampling methods for quality construction

Chang, L M and Hsie, M (1995) Developing acceptance-sampling methods for quality construction. Journal of Construction Engineering and Management, 121(2), pp. 246-253. ISSN 0733-9364

Abstract

An acceptance-sampling method plays an important role in designing quality-assurance (QA) specifications. It applies statistics to specify the requirements of (1) how many measurements are needed; and (2) how to make an acceptance or rejection decision based on measured data. The key function of the acceptance-sampling method is to guide the decision between accepting or rejecting the quality of the products. The purpose of this paper is to present four acceptance-sampling methods, including (1) variable-single-sampling method; (2) quality-index-sampling method; (3) attribute-double-sampling method; and (4) attribute-proportion-sampling method. In this paper, the theories will be derived and the applications of the four developed quality-acceptance-sampling methods will be described. The advantages and disadvantages of using different sampling methods are compared. The application of the developed quality-acceptance-sampling methods is illustrated using bridge-painting examples.

Item Type: Article
Index terms: statistics, sampling, specification
Subjects: mathematical modelling, data collection methods, contractual condition
Topics: Contract Administration, Research Practice
Descriptive scope: 3 PEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here