HSM-simulation-based planning method for construction projects

Sawhney, A and AbouRizk, S M (1995) HSM-simulation-based planning method for construction projects. Journal of Construction Engineering and Management, 121(3), pp. 297-303. ISSN 0733-9364

Abstract

Construction projects are characterized by the random nature of the conditions under which they are implemented and by the dynamic use of available resources. Since site conditions vary randomly and resources perform a multitude of functions on various work tasks, planning of construction projects using traditional tools like the critical path method becomes limited and induces deficiency in the resulting plan. This paper demonstrates that a simulation-based methodology is appropriate for modeling such a scenario. The hierarchical simulation modeling (HSM) method, a simulation-based method, for planning of construction projects is presented. HSM enhances and combines the concepts of work breakdown structure and process modeling to arrive at an advanced framework for planning. Hierarchical and modular simulation constructs form the basis of this method. The construction of a bridge (Peace River Bridge) is used to illustrate HSM concepts and its advantages.

Item Type: Article
Index terms: planning method, simulation modelling, modelling, process modelling, methodology, construction project, critical path method
Subjects: production management, research methods, analytical methods, urban planning, design analysis, operations research
Topics: Governance, Engineering Principles, Project Management, Research Practice, Time Control, Design Practice
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here