Routing large vehicles on industrial construction sites

Varghese, K and O'Connor, J T (1995) Routing large vehicles on industrial construction sites. Journal of Construction Engineering and Management, 121(1), pp. 1-12. ISSN 0733-9364

Abstract

This paper describes the development of a prototype system for planning access routes for large vehicles within an industrial construction site. Access planning is an important consideration in the development of an effective project-execution plan. But conventional planning tools do not facilitate effective planning. The primary objectives of this work are to define a structured process for planning access and to automate the tedious and difficult tasks within the process. Concepts from the areas of information representation, geometric reasoning, and artificial intelligence are found to be applicable for automating route-planning tasks. The implementation of these concepts to develop the route-planning system is achieved by using the expert system Nexpert Object and the geographic information system Arc/Info in conjunction with the computer-aided design (CAD) package Microstation, the spreadsheet Excel, and custom programs.

Item Type: Article
Index terms: execution plan, program, prototype, package, expert system, computer aided design, implementation, geographic information system, reasoning, industrial construction, artificial intelligence, spreadsheet
Subjects: artificial intelligence, software systems, contractual arrangements, geographical techniques and analysis, data management, modelling and simulation, cognitive psychology, computational design, project controls, building construction, data science
Topics: Procurement, Time Control, Geographical Context, Digital Applications, Research Practice, Engineering Principles
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here