Constructing new automotive production facilities in a mature brownfield site

Eksteen, B and Krause, S (2002) Constructing new automotive production facilities in a mature brownfield site. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Abstract

Manufacturing industries periodically adapt, refurbish or upgrade their production facilities to produce new products or new models, introduce new technology or accommodate new business strategies. Intensive and lengthy market, environmental and internal analysis, reengineering and adaptation precede the need for new facilities. This process is dynamic and thus project management, design and construction of new facilities, while under way, may be subject to frequent and considerable change, which must be accommodated within the project parameters of budget, time and quality. Research was conducted on project management issues affecting the provision of new production facilities in a mature brownfield site in the motor industry. This industry was selected for the study, inter alia, because it frequently introduces major and minor changes to its production lines and operates in a complex, competitive and high-technology environment. The research included a literature survey and empirical data obtained from motor vehicle and component manufacturers and service providers. This paper presents those literature and empirical surveys and findings dealing with the effects on the contractors who construct the new facilities, includes a survey among contractors who undertake such work, concludes that particular demands are made on contractors and suggests guidelines for clients and project managers.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: alterations; industrial construction; project management; refurbishment; strategic management
Index terms: survey, adaptation, business strategy, manufacturing industry, new technology, project manager, manufacturer, project management, industrial construction, design and construction, strategic management
Subjects: industry analysis, building construction, project management theory and practice, management, innovation and technology management, contractual arrangements, practitioner, business, user focus, data collection methods, profession
Topics: Design Practice, Roles and Professions, Procurement, Business Strategy, Project Management, Research Practice, Engineering Principles
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here