Making effective use of construction lessons learned in project life cycle

Kartam, N A (1996) Making effective use of construction lessons learned in project life cycle. Journal of Construction Engineering and Management, 122(1), pp. 14-21. ISSN 0733-9364

Abstract

Expert knowledge and lessons learned in the construction phase of a project are not systematically incorporated into the design and construction phases of subsequent projects. The advancement of construction since ancient times has been predicated on the communication of lessons learned. Although past efforts have focused on the design phase, opportunities for the collection and utilization of lessons learned exist in all phases of a project life cycle. Constructability, the early integration of construction knowledge into all phases of a project, can be improved by effective use of lessons learned. This paper identifies feedback channels in a project life cycle and describes previous and current efforts to develop lessons-learned systems. Next, the paper describes the design and implementation of a constructability feedback prototype called interactive knowledge-intensive system (IKIS) for constructability improvement (IKIS-Constructability). Finally, the paper highlights the operation of this system and its potential benefits.

Item Type: Article
Index terms: feedback channel, prototype, integration, lessons learned, life cycle, design and construction, design phase, construction phase, constructability, implementation
Subjects: value management, modelling and simulation, project delivery, professional practice, contractual arrangements, construction integration, communication studies, professional development, organizational analysis
Topics: Design Practice, Organizational Design, Information Management, Engineering Principles, Project Management, Procurement
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here