Lin, K L and Haas, C T (1996) An interactive planning environment for critical operations. Journal of Construction Engineering and Management, 122(3), pp. 212-230. ISSN 0733-9364
Abstract
In this paper, an interactive critical operations planning environment (COPE) is described for planning critical construction operations involving large semistationary equipment such as cranes, concrete pumps, and manipulators. Careful planning is necessary for the use of semistationary equipment; however, formal planning methods and tools are limited. Planning is typically the responsibility of a small pool of experts whose knowledge is largely undocumented. Automating and formalizing aspects of the planning process can improve the productivity and effectiveness of expert or nonexpert critical operations planners. The proposed planning environment uses computer-aided drafting tools and a set of computerized planning primitives to facilitate a very visual planning process. The planning principles implemented include human-computer interaction, constraint enforcement, and performance measurement. Implementation details and initial research results are presented in this paper, which follows previous work. With the developed planning environment and process, a significant amount of planning time can be saved so that more alternatives can be evaluated. A better plan can be determined through comparison of more alternatives. The structured planning process also allows planners to perform more detailed analyses on planning problems. Better decisions can thus be made based on the analyses.
| Item Type: | Article |
|---|---|
| Index terms: | human-computer interaction, enforcement, implementation, drafting, planner, effectiveness, productivity, construction operation, performance measurement, planning process, planning method |
| Subjects: | profession, contractual arrangements, construction operations, technical documentation, urban planning, health safety and environment, performance management, management, performance measurement, human-computer interaction, project controls |
| Topics: | Health and Safety, Business Strategy, Governance, Procurement, Roles and Professions, Quality Management, Digital Applications, Design Practice, Time Control, Site Management |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here