Ibbs, C W (1997) Quantitative impacts of project change: Size issues. Journal of Construction Engineering and Management, 123(3), pp. 308-311. ISSN 0733-9364
Abstract
Change has a tremendous effect on the performance of a construction project. Research that focuses on the quantitative impact is limited, incomplete, and in some cases questionable. The goals of this study were to quantify the nature and impacts of project change and develop recommended practices so that owners and contractors can manage change better. The focus was on project change during detailed design and construction, in particular the size of change and its impact on the project. These results show that the amount of change is negatively correlated with productivity and total installed project cost, whether within the design phase or construction phase, or between them. The greater the amount of change the more productivity and costs are degraded. Recommendations are also offered here on how to mitigate the impact of project change.
| Item Type: | Article |
|---|---|
| Index terms: | construction phase, construction project, project cost, design phase, owner, design and construction, productivity |
| Subjects: | production management, management, sociology, professional practice, contractual arrangements, project delivery, economics |
| Topics: | Stakeholder Management, Design Practice, Business Strategy, Procurement, Project Management, Cost Management |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here