Maxwell, D A; Back, W E and Toon, J (1998) Optimization of crew configurations using activity-based costing. Journal of Construction Engineering and Management, 124(2), pp. 162-168. ISSN 0733-9364
Abstract
The goal of this research was to develop and illustrate a technique for finding the optimum crew configuration, from a range of possible configurations, assigned to complete a defined quantity of work in a timely and cost-effective manner. The concept of activity-based costing was used to define the scope of the work in terms of the activities to be accomplished and their associated productivity rates and cost of performance. These data are modeled as distributions of random variables. Past experience, as well as local job conditions, can be used to determine the values associated with these distributions. The temporal and logical relationships between the activities are established through a process flowchart. An activity based, stochastic simulation program (ABC-SIM), was used to measure the elapsed time and activity cost for each of the candidate crew configurations. Excess cost is the activity cost minus the shift cost, which is based on the number of full shifts required to accomplish the work multiplied by the cost per shift. Excess cost is a measure of inefficiency caused by crews waiting in queue. Finally, an optimum crew configuration can be selected using an optimization rule that best satisfies project objectives.
| Item Type: | Article |
|---|---|
| Index terms: | productivity, costing, configuration, program |
| Subjects: | management, accounting and finance, software systems, systems engineering |
| Topics: | Digital Applications, Business Strategy, Cost Management, Engineering Principles |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here