The application of a pilot pull planning system to construction projects

Johansen, E (2002) The application of a pilot pull planning system to construction projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Abstract

A new planning system was introduced as a pilot within a large UK construction company. The system, which attempts to address some of the problems of construction “front end” planning, is investigated relative to Lean Construction and specifically the Last Planner system. The purpose is to see if it can be used as the basis for applying a lean planning model which the company intends to introduce and test through a research project. The existing system is seen to have strengths in terms of goodwill and commitment from the participants but is still fundamentally linked to the schedule pushed traditional approach to planning which is seen to be unsuccessful. An attempt to use “first run studies” to produce high quality planning and performance information was partly successful and indicated possibilities for future implementation. Further work is needed to fully develop the application model and training in the fundamentals of the system will be needed to improve performance.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: lean planning; last planner; pull planning
Index terms: construction project, commitment, last planner system, construction company, implementation, lean construction, planner
Subjects: project controls, profession, contractual arrangements, building construction, organization, production management, psychology
Topics: Organizational Design, Business Strategy, Site Management, Project Management, Procurement, Time Control, Roles and Professions
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here