Tunnel construction costs for tube transportation systems

Sinfield, J V and Einstein, H H (1998) Tunnel construction costs for tube transportation systems. Journal of Construction Engineering and Management, 124(1), pp. 48-57. ISSN 0733-9364

Abstract

Tube tunnel systems for transporting freight in cities may provide an attractive solution to congestion problems. A feasibility study sponsored by the Federal Highway Administration examined the cost of building networks of tube tunnels with different network densities for a variety of freight sizes ranging from packets to standard containers. In this context, costs for tunneling, relocating utilities, and building access shafts in urban environments were determined. This paper briefly reviews the application of freight tube transportation systems. It concentrates on the cost data and the methodology by which the cost of tunneling networks is determined, since this information is of general interest and can be applied to similar projects. The cost calculated for a variety of tube network scenarios in actual city environments illustrates the applicability of the methodology and also indicates the potential viability of tube tunnel networks.

Item Type: Article
Index terms: utilities, tunnel construction, density, cost data, tunnel, feasibility study, tube, urban environment, methodology
Subjects: civil engineering, accounting and finance, research methods, infrastructure and transport systems, construction type, materials science, urban sustainability, design stages, analytical methods
Topics: Research Practice, Engineering Principles, Cost Management, Construction Technology, Design Practice, Urban Studies
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here