Activity-based construction (ABC) modeling and simulation method

Shi, J J (1999) Activity-based construction (ABC) modeling and simulation method. Journal of Construction Engineering and Management, 125(5), pp. 354-360. ISSN 0733-9364

Abstract

This research presents the activity-based construction (ABC) modeling and simulation method. ABC modeling (ABC-Mod) uses one single element (e.g., activity) for modeling general construction processes instead of multiple elements as required by current simulation systems. ABC simulation (ABC-Sim) executes the ABC model by manipulating activities in three stages: (1) Select activity; (2) advance simulation; and (3) release simulation entities. ABC-Mod and ABC-Sim constitute a unique simulation method, generally addressed as ABC. In summary, ABC is a general-purpose modeling and simulation method with an emphasis on construction application. Compared with existing simulation systems, it has all of the major features required for modeling and simulating the dynamic and random behaviors of a construction process. It requires no more knowledge to use than the critical path method does. Therefore, ABC is a simulation method for construction engineers and it has a potentially wide range of application in the industry.

Item Type: Article
Index terms: engineer, modelling, critical path method, construction process
Subjects: building construction, operations research, analytical methods, profession
Topics: Time Control, Site Management, Roles and Professions, Engineering Principles
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here