Smith, G R and Bohn, C M (1999) Small to medium contractor contingency and assumption of risk. Journal of Construction Engineering and Management, 125(2), pp. 101-108. ISSN 0733-9364
Abstract
This paper is the result of an investigation into the use of contingency in smaller construction firms. It summarizes recent literature classifying construction contract risks and mitigation measures. Eight major classifications are used to organize the types of risk found in the literature. The risks are described in detail with associated risk mitigation strategies. Risk modeling techniques are briefly reviewed for their contribution to the risk categorization and contingency estimating. After reviewing the researcher's concepts of risk management in the literature, interviews were conducted with estimators and/or construction managers involved in the bidding process at 12 small to medium construction firms. The purpose of the interviews was to investigate the current risk management practices of small and medium size construction firms. The times when smaller companies used contingency had specific interest for the research. The literature findings were compared with important risk factors identified from the interviews. The main conclusion drawn from the comparison was that small to medium size contractors predominately use contingency in those situations where they are construction managers in a reimbursable contract. Generally, they do not use line item contingency in competitive bidding situations. Thus, these firms are assuming proportionally greater business risk than suggested by the literature on contingency.
| Item Type: | Article |
|---|---|
| Index terms: | strategy, construction firm, interview, competitive bidding, risk mitigation, bidding, estimating, estimator, mitigation, construction manager, modelling, construction contract, investigation, risk management, risk factor |
| Subjects: | financial risk, management, environmental hazards, data collection methods, profession, risk assessment, contract type, organization, bidding, analytical methods, financial and cost management |
| Topics: | Procurement, Sustainability, Risk Management, Roles and Professions, Research Practice, Engineering Principles, Business Strategy, Cost Management |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here