A generic database for whole life costing applications in construction

Kishk, M; Al-Hajj, A; Pollock, R and Aouad, G F (2002) A generic database for whole life costing applications in construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Abstract

This paper is the third in a series reporting on-going research within an EPSRC-funded research project undertaken by a joint collaboration between the Robert Gordon University and the University of Salford. This project aims to develop IT applications of whole life costing (WLC) to support the decision-making process in the design and management of construction assets. A WLC resource database has been designed and implemented in MS Access 2000? to accommodate WLC cost data and their time horizons and other data categories including quality and performance data. The database was designed on the basis of an in-depth analysis of the requirements of effective WLC decision-making during the design stage. The database relational structure is introduced and the data types and descriptions of fields of various tables are explained. In addition, three input forms designed to facilitate editing data are included. Finally, directions for further future research are introduced.

Item Type: Conference Paper (Paper)
Uncontrolled Keywords: automation; integrated databases; life cycle costing; whole life costing
Index terms: decision-making, editing, costing, automation, life cycle, design stage, decision-making process, whole-life costing, cost data, database, collaboration
Subjects: management, data management, occupational health, accounting and finance, research dissemination and communication, automation and robotics, decision analysis, value management, professional practice
Topics: Organizational Design, Digital Applications, Risk Management, Research Practice, Design Practice, Cost Management, Project Management, Health and Safety
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here