Project performance control in reconstruction projects

McKim, R; Hegazy, T and Attalla, M (2000) Project performance control in reconstruction projects. Journal of Construction Engineering and Management, 126(2), pp. 137-141. ISSN 0733-9364

Abstract

Cost, schedule, and quality are the main indicators of performance in construction projects. These indicators are highly interrelated and require some balance and trade-off among them to achieve efficient overall control over project performance. Focusing on these performance indicators, the primary objective of this study is to investigate the use of conventional control techniques in projects involving reconstruction of occupied buildings. To facilitate this analysis, performance data have been collected, using a questionnaire survey, from 25 reconstruction and 15 new construction projects. The survey was followed by structured interviews with construction practitioners and project participants to elicit success-related factors and to identify some of the unique problems affecting the control of reconstruction projects. Using the collected data, performance comparison was conducted between new and reconstruction projects along with a detailed analysis of the suitability of existing techniques for the control of the cost, schedule, and quality in reconstruction projects.

Item Type: Article
Index terms: project performance, reconstruction, construction project, questionnaire, suitability, interview, performance indicator, construction practitioner, survey
Subjects: data collection methods, design criteria, building construction, project management theory and practice, professional development, production management, performance management
Topics: Project Management, Research Practice, Information Management, Engineering Principles, Design Practice, Quality Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here