Optimal repetitive scheduling model with shareable resource constraint

Leu, S S and Hwang, S T (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, 127(4), pp. 270-280. ISSN 0733-9364

Abstract

An optimal repetitive scheduling model for precast production with the consideration of resource constraints and resource sharing is proposed in this paper. A repetitive schedule, like precast production, needs to take into consideration the impact of limited resources, including equipment (such as cranes, forms, and steaming curing facilities) and skilled labor, on production makespan. Moreover, to economically and effectively utilize these valuable resources (such as cranes and work crews), it is worth taking resource sharing into consideration in precast production. A genetic algorithm-based searching technique is adopted to establish an optimal resource-constrained repetitive precast production scheduling system with the consideration of resource sharing. The system can effectively provide the optimal or near-optimal combination of production durations, resource amounts, and minimum makespan under the constraint of limited resources and with the consideration of resource sharing.

Item Type: Article
Index terms: duration, scheduling, genetic algorithm, skilled labour, repetitive scheduling, curing, resource constraint
Subjects: operations management, operations research, project controls, concrete and cementitious materials, management, algorithms
Topics: Human Resources, Digital Applications, Time Control, Construction Materials, Project Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here