Time-lapse digital photography applied to project management

Abeid, J and Arditi, D (2002) Time-lapse digital photography applied to project management. Journal of Construction Engineering and Management, 128(6), pp. 530-535. ISSN 0733-9364

Abstract

A discussion about movies used to monitor activities on a construction site is presented. A new concept in time-lapse photography is introduced, where the user records pictures of a construction site shot at an optimal frame rate and is able to play back time-lapse movies at lower frame rates, this way adjusting the running time and detail of the playback movie. A software package is built in the Windows visual environment, capable of generating a time-lapse movie of a desired frame rate from a regular digital movie shot at the construction site. The selection of the most appropriate frame rate to handle different managerial issues such as analyzing claims, investigating accidents, and monitoring progress is discussed. Solutions are sought to the problem of storing the vast amount of digital information generated by movies, using commercially available storage devices.

Item Type: Article
Uncontrolled Keywords: computer software; construction sites; digital techniques; photography; project management
Index terms: monitoring, project management, software package, construction site, window, digital technique
Subjects: software systems, architectural elements, project management theory and practice, work location, innovation and technology management, control systems
Topics: Project Management, Engineering Principles, Design Practice, Site Management
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here