Case study of obsolescence and equipment productivity

Bhurisith, I and Touran, A (2002) Case study of obsolescence and equipment productivity. Journal of Construction Engineering and Management, 128(4), pp. 357-361. ISSN 0733-9364

Abstract

The change in productivity is studied for six different pieces of earthmoving equipment over a period of 15 years. It is shown that the production rate of this group of equipment has increased 1.58% on average per year. During the same period, without adjusting for inflation and making specific assumptions, the unit price of production has increased at an average rate of 1.77% per year. The results of this analysis may be used in modeling obsolescence costs in equipment replacement analysis. The equipment considered includes two models of wheel-type loaders, one track-type loader, one scraper, and two track-type dozer models.

Item Type: Article
Uncontrolled Keywords: case reports; construction equipment; costs; productivity
Index terms: case study, construction equipment, productivity, obsolescence, earthmoving, modelling, inflation, replacement
Subjects: analytical methods, economic analysis, construction operations, data collection methods, materials science, asset management, management, construction equipment
Topics: Site Management, Engineering Principles, Research Practice, Business Strategy, Plant and Equipment
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here